Secret Squirrel examines,now, the costs of fuels comparing nuclear fuels used in nuclear reactors and those used by thermal plants,all resulting in the same end, heating,boiling water, to generate steam to turn steam turbines, to generate electricity.
First we'll look at nuclear fuels and the processing it actually requires.
Steps to create the fuel,(all involve transportation)
1-Mining,and milling
2-Conversion
3-Enrichment
4-Fuel Bundle fabrication
5-Used in Nuclear reactor to boil water,generate steam to turn a turbine.
6-Must be stored beneath water else catches fire and releases radiations(gases ,particles),goes to 7 (or sometimes then straight to 9,burial)
7-Reprocessing (seperating the to be waste products)
8-Vitrification (waste preprocessing)
9-Final disposal for burial
So nuclear fuel and it's manufacture and use is cheaper thermal plant fuels?Hardly likely.In no way shape nor form is it so,not at all, not in the long term,nor in the short term.And, compared with the thermal fuels, the whole business,and process all along the way,all along the line, is extremely,highly,dangerous,hazardous,life threatening,an accident of nuclear proportions waiting to happen anywhere along its line,from manufacture on up to, and including burial disposal, and even there, in burial remains dangerous for decades.
Now that's certainly a lot of processes.France and the UK do all,but NOT mined.Japan does not mine nor vitrify,The USA and Russia does all including mine, but does not vitrify.Other nations do some work with the uranium.But it requires, all along the way, highly expensive to build, plants, plants to handle increasingly radioactive materials to assemble a fule bundle necessary for a reactor to use, and just note how very few such plants exist to do exactly that. Uranium mining nations are Australia,USA,Canada,Namibia,Niger,Argentina,Russia,Germany, Ukraine,Roumania,Spain,Khazakstan, mainly because they have it elementally. All nations have coal,and natural gas,and there are many yet more oil producing nations as compared with the highly restricted short list of nations which have uranium mines.
Russia and Lithuania use over 70% nuclear,Japan,Germany,Sweden,Switzerland,Hungary, Slovenia,Slovakia,Ukraine,Bulgaria over 30%.Russia,Finland,Spain,England,Czechs are over 15%, rest region 15%,and some very fortunate nations, not at all, like Australia,Italy,Turkey, Norway,Ireland,Greece, and some others, the smarter than average ones.Indeed they have other sources to generate electricity,efficiently,economcially, safely, and far less expensively.
Now let's consider the thermal plants, in particular,coal fired ones.
To get coal to the same useable state to be used to generate the steam required to turn electrical turbines, its mined, and transported to the thermal plant, there it's pulverized,mixed with hot air and injected in to the furnace,to boil water,generate steam to turn the turbine,which gives the electricity.That's all there really is to it.Oil and natural gas similarly.Some coal
fired plants are built right near to the mines themselves, so near the coal is delivered by simple conveyer.Simple and cheap,isn't it.Coal can also be effectively delivered by train right to the plant.Natural gas plants are simply built adjacent to the natural gas pipelines.Smart move that is.Fuel for bunker oil fired plants can be delivered by pipeline,tanker,rail tank cars,safely ,cheaply.They too can be built right near to the supply pipeline.
Now for coal, or rather from coal, there is a residue left,a waste product,that of coal ash. Now coal ash is nowhere's near as dangerous as nuclear waste.As a matter of fact,it has a great many applicable uses, and can be thence sold in to the economy.What uses you ask? Well there are a great many.
It’s used for making cement and concrete products
It’s used in structural fills and embankments
It’s used as mineral filler in asphalt pavement
It’s used to stabilize waste materials
It’s used to level out uneven terrain on sites including housing developments, malls and runways.
To be used in this way, coal ash must meet certain requirements.
For example, in Portland Cement Concrete, fly ash must meet the standards of ASTM C618. The ASTM is the American Society for Testing and Materials.The ash used to produce Portland cement actually allows some cutbacks in using oil. It would have taken 55 gallons to produce one ton of cement.
Coal ash has also been found useful in the making of:
Paints and plastics
Kitchen countertops
Soil for growing plants. It increases crop yields.
Bowling balls
Vinyl flow covering
Shower stalls
Gee just try and do that with still heavily radioactive waste, as in fuels etc etc etc.
(http://www.coalashfacts.org/)
In epistle,
"In 2007, the United States produced 131 million tons of coal combustion products. While 43 percent were used beneficially, nearly 75 million tons were disposed of. By using coal ash instead of disposing of it in landfills we are avoiding the environmental degradation and energy costs associated with mining virgin materials. We are building stronger, longer-lasting
structures that save taxpayer dollars and minimize environmental impacts. For every ton of fly ash used in place of portland cement about a ton of carbon dioxide is prevented from entering the Earth’s atmosphere. Also, it takes the equivalent of 55 gallons of oil to produce a single ton of cement.
Another significant benefit of using fly ash is that it requires less water than portland cement, conserving a limited resource, while also reducing a project’s water and equipment costs. Boiler slag, which replaces sand in blasting grit, has the benefit of being free of silica, which eliminates the potential health risk of silicosis. Flue gas desulfurization materials are used in 30
percent of U.S. wallboard products, avoiding the need to mine gypsum. Environmentally and economically it makes more sense to use existing materials than to mine new ones.And it also makes much more sense,environmentally and financially,economically to use thermal in place of nuclear".Her ends the epistle.
Talk is cheap, nuclear isn't.Thermal talks the talk, walks the walk,safely,efficiently, inexpensively,cheaply.Nuclear is a much more costly,unjustifiable loss leader in the field of electrical energy generation.Nuclear energy is a looser,a financial looser,which takes you with it.
Secret Squirrel of the MRL, enter the world of Secret Squirrel, discover Secret Squirrel's improvements for the world, improvements for you.Secret Squirrel, the MRL politician of the future trapped in the time-warp of today,trapped in the backside of the future.
Link List
The World Of Secret Squirrel
What's good for Squirrel,is good for the world,is good for you!
You'll see!
You'll see!
Search This Blog
Pages
Showing posts with label thermal. Show all posts
Showing posts with label thermal. Show all posts
Friday, May 13, 2011
Sunday, May 8, 2011
Secret Squirrel Compares The Ridiculous Financial Cost Of Nuclear Versus Thermal
Secret Squirrel examines nuclear and its financial costs, versus those of thermal plants,thermal plants fired by whatever means,be it natural gas, oil, or coal.Squirrel sees Nuclear as being extremely expensive in the sum toto, taking in any means what so ever and factoring the costs in.Many times, the construction of a reactor,using the USA as an example,has been halted due to costs rising above and beyond,costs stated to be rising due to construction structural problems, errors in construction being impossible to correct,and as stated being, that on completion electrical costs would HAVE to be increased to the consumer as well. So, nuclear is far from being the efficient,cheap solution to any particular energy crunch. Face it, you can build a
nuclear reactor, or you can build other types of generating facilities.Let's look at the costs now of nuclear, aside the radiation costs when a plant goes sour,the costs to farmers,fisherman, the costs to human life and lives,for a drastic period,the maiming,crippling,mutating effects of nuclear on the yet to be born,the cancers they generate when they go sour,the human and life factors, let's look at the heavy financial burdens they are besides the now evident extremely dangerous,unmanageable, extremely horrific bio hazard that they are.
Now construction costs, as of 2004, run to US$1,300 per kilowatt, or $650(to 780) million for a 500 MWe unit coal fired plant cost to build.Nuclear plants run at,usually, in the vicinity of,when producing electricity, twice that 1000mw area,around say 1300mw,output per reactor,average.So say costs of thermal plant then doubles to 1300,million, or 1.3Billion.Even if we then triple, it 1.9billion for 1500MW,versus the single reactor, the thermal equivalent is, really, inexpensive by comparison,as the Germans say, nicht whar? Thermal plants there for come out very,very much cheaper to build and operate versus the nuclear reactor.Say the units are a 4 reactor job,as Cherokee was, that equates to 7.6billion...all right.......but
Cherokee,nuclear, cost,and was abandoned at. an amazing 11billion building cost,and was still rising, when it was abandoned,but a thermal plant same capacity as Cherokee's 3 reactors, would cost,fixed,5.7 billion.Thermal is justifiably cheaper, by a very long shot.There's yet more to Cherokee, let's look at that.
The energy efficiency of a conventional thermal power station, considered as salable energy (in MW) produced at the plant busbars as a percent of the heating value of the fuel consumed, is typically 33% to 48% efficient,but politicians are refusing to allow utility companies to build coal fired power plants,favoring,strangely,expensively, and dangerously, nuclear plants.Public officials in Kansas, Oklahoma, and Texas have already denied several utilities permits to build coal fired plants that would generate cheap electricity for consumers.Keep in mind that wind energy is more expensive than coal fired electrical
plants.
Let's continue with yet another abandonment of nuclear construction, that of Marble Hill.When construction was finally closed,stopped,halted, more than $2.8 billion had been spent on construction, and it was only 20% complete,imagine, four 2 1000MW reactors.A thermal would cost 2.6 billion for same energy value of electricity the reactor(s) would produce, and yet be COMPLETED for that cost, and Marble Hill, at 2.8billion,was only 20% completed.So where is the cost energy saving there? So not true then is the statement that nuclear is cheaper,less costly, so very not at all.There's yet more to Marble Hill, let's look
at that much more closely...Marble Hill had two reactors, or was to , of about 1000mw each....Construction did proceed on Marble Hill, but at a somewhat slower pace with more regulatory emphasis on safety issues. Then a symbolic bombshell dropped on the project when, on May 8, 1979, Charles Cutshall, a former employee of Marble Hill's general contractor, Gust K. Newburg, filed an affidavit indicating that he and other Newburg employees had been told to "cover up" construction defects before inspectors could find them.When it finally closed,as in construction terminated, more than $2.8 billion had been spent on construction, and it was only 20% complete...and that, it seems, was defective.How many similar plants have defects in their so called containment structures?We can only guess, BUT we know it CAN and DOES, happen in practice.Specifically, the defects that Cutshall revealed were in the concrete poured in the walls of the containment buildings. Cutshall claimed that "honeycombs" were in a number of areas of the vital containment structure that would protect people from a breach of radioactive gas should a situation like Three Mile Island happen at Marble Hill.Not very enticing in construction is it?
Let's look at another costly non construction, or at least, completion.The Shearon Harris site was originally designed for four reactors, but budget issues and weak demand resulted in three of the reactors being cancelled. The final cost was nearly $3.9B,at abandonment.Yet more thermal plants could easily have been funded, and successfully built and in operation, at fractional costs for the sum total.
And how further expensive has been nuclear.Well, look at these abandonments of construction of reactors,at Bellefonte.Black Fox,Bodega Bay,Callaway,Cherokee,Clinton,Columbia,Hartsville,Haven,Hope Creek,Marble Hill,Midland,North Anna,Pebble Springs,Perry,Phipps Bend,River Bend,Pilrim,Satsop,Sears Island,Seabrook,Shearon Harris,Surrey,Tyrone,Yellow Creek,Zimmer,These abandonments in construction,have between them 45 reactors cancelled during construction due to costs, high costs,
enormous expenditures.So the reactors were thence far too costly for complete, and while 1 billion,at least per abandonment in construction, is low expenditure, some went to items such as $2.8 billion for only 20% complete.So nuclear is inexpensive,cheap,easy to construct? So very,very NOT!It SHOULD scream at you! It does! It should SCREAM at THEM,GOVERNMENT, but the scream falls on ears,deaf,dumb,blind, stupid,ignorant,retarded,and idiot, ears of the government, the politician.The 2.8 billion uselessly expended ,in this case,on Marble Hill,would've provided for 5 (five),count'em, 5(five) thermal plants of equal
electrical output,had the monies been expended on construction of them,and successful construction it WOULD most definitely have been as well.So in place of those 5, NONE,ZERO.Expensive? Yes,most assuredly, financially unsound decisions,undertakings, even yet in terms of cost alone.We all know the undertakings nuclear can and has resulted in, and is resulting in,undertakings not to be suffered by use of thermal,don't we.in terms of the cost LOST entirely on the abandonments, all of America could've been
provided with CHEAP electrical energy in sums vastly greater than existing nuclear plants all wasted, for nothing, on the nuclear dream,the nuclear lie, the nuclear hallucinogenic idiocy politicians suffer from.And many yet more as well in number than those present and existent nuclear plants.Is nuclear justified financially?In no way shape nor form.Cheap nuclear energy?
An unreality, a lie, the nuclear lie.
Now let's consider new constructions.......
Recent construction cost estimates
(http://en.wikipedia.org/wiki/Economics_of_new_nuclear_power_plants)
2007 estimates have considerable uncertainty in overnight cost, and vary widely from $2,950/kWe (overnight cost) to a Moody's Investors Service conservative estimate of between $5,000 and $6,000/kWe (final or "all-in" cost).
However, commodity prices shot up in 2008, and so all types of plants will be more expensive than previously calculated In June 2008 Moody's estimated that the cost of installing new nuclear capacity in the U.S. might possibly exceed $7,000/kWe in final cost.
The reported prices at six new pressurized water reactors are indicative of costs for that type of plant:
February 2008 — For two new AP1000 reactors at its Turkey Point site Florida Power & Light calculated overnight capital cost from $2444 to $3582 per kW, which were grossed up to include cooling towers, site works, land costs, transmission costs and risk management for total costs of $3108 to $4540 per kilowatt. Adding in finance charges increased the overall figures to $5780 to $8071 per kW.
March 2008 — For two new AP1000 reactors in Florida Progress Energy announced that if built within 18 months of each other, the cost for the first would be $5144 per kilowatt and the second $3376/kW - total $9.4 billion. Including land, plant components, cooling towers, financing costs, license application, regulatory fees, initial fuel for two units, owner's costs, insurance and taxes, escalation and contingencies the total would be about $14 billion.
May 2008 — For two new AP1000 reactors at the Virgil C. Summer Nuclear Generating Station in South Carolina South Carolina Electric and Gas Co. and Santee Cooper expected to pay $9.8 billion (which includes forecast inflation and owners' costs for site preparation, contingencies and project financing).
November 2008 — For two new AP1000 reactors at its Lee site Duke Energy Carolinas raised the cost estimate to $11 billion, excluding finance and inflation, but apparently including other owners costs.
November 2008 — For two new AP1000 reactors at its Bellefonte site TVA updated its estimates for overnight capital cost estimates ranged to $2516 to $4649/kW for a combined construction cost of $5.6 to 10.4 billion (total costs of $9.9 to $17.5 billion).
April 2008 — Georgia Power Company reached a contract agreement for two AP1000 reactors to be built at Vogtle, at an estimated final cost of $14 billion plus $3 billion for necessary transmission upgrades.
In comparison, the AP1000 units already under construction in China have been reported with substantially lower costs due to significantly lower labour rates:
In 2007, the reported cost for the first two AP1000 units under construction in China was $5.3 billion.
In 2009, the published cost for 4 AP1000 reactors under construction in China was a total of $8 billion.
Notice the immense costs, a very far cry from the by comparison peanut cost of a thermal plant of course, these are the projected costs, the actual construction costs......curiously.......escalate yet further.
Let's look at Vermont, and the Vermont Yankee nuclear plant.It is a General Electric boiling water reactor (BWR) type nuclear power plant currently owned by Entergy. It is located in the town of Vernon, Vermont, and generates 620 megawatts (MWe) of electricity at full power.Note that a thermal coal or other fired plant could do the same,produce just as much, cost considerably less, and be infinitely safer in operations.Now the plant began commercial operations in 1972. It provided 71.8% of all electricity generated in Vermont in 2008, which is 35% of the overall electricity used in the state.Again, note so too could a thermal plant you know.
Coal fired, and thermal, have a life expectancy of 25 years in design,same a nuclear really, but can also be easily renovated to go far longer,at far less cost, than a renovated job on a nuclear reactor plant,and at far less cost than nuclear plants.Also note that no less than 38 coal fired plants STILL exist in the United States,from the 1940's.A nuclear plant would so utterly and completely not be here in that time slot.The coal fired goes on and on and on and on....and safely too.
Generally speaking, nuclear plants were designed for a life of about 30 years. Newer plants are designed for a 40 to 60-year operating life.Thermal plants easily match and exceed this.But what happens at the end of life, the end of a reactor? It must be decommissioned,dismantled,taken away,bury etc etc etc, and so too must it's nuclear fuel needs be decommissioned as it were.How is this done? Well there is the so called..
Safe Enclosure (or Safestor(e) SAFSTOR):
This option postpones the final removal of controls for a longer period, usually in the order of 40 to 60 years.
And..
Entombment:
This option entails placing the facility into a condition that will allow the remaining on-site radioactive material to remain on-site without the requirement of ever removing it totally. This option usually involves reducing the size of the area where the radioactive material is located and then encasing the facility in a long-lived structure such as concrete, that will last for a period of time to ensure the remaining radioactivity is no longer of concern.
Yes,it can be dismantled and buried, and the spent and nuclear fuels specially stored in water pools for dozens of years etc. and only safely as long as it's storage pool water levels can be maintained, else the rods go in to self-criticality and release radiations just as they do and would if a reactor suffers coolant loss. And so now we know,too, that the building itself, et all support buildings,etc what they previously cost in sum toto, is a write off......in short.......the building(s) is(are) useless,in all instances......and build a new reactor.well look at the costs of building.....and the escalating costs......
Additional costs, hidden costs, of a reactor.......the required mining, processing of and then conversion to Fuel rods and from rods assembly to fuel bundles,in short creation of it's fuel,is expensive.Consider coal,oil,natural gas is much easily, and if not int he same fashion, got out of the ground, yes, but then nucelar fuel has enormous processing development,creation costs versus that which the thermal plant uses.Thermal plants use coal, oils, natural gas, easily gotten hold of, processed as you are familiar with.Thermals also don not have the after use storage of costs of the so called spent (only partially spent bundles,you know, as are most definately capable of self-criticality whence water is removed from them as we know, generating the self same nuclear radiations of all varieties just as if the reactor had exposed and melted down, especially since they are stored in QUANTITY,vast QUANTITY at the nuclear site or wherever they are stored, and thence after the cost of dismantling and burial storage of a dirty reactor),fuels.
Tired of the thermal plant?Switch it off.Decomission it, simply abandon it. It can be started up again later,anytime really at miniscule costs.On, off, no problem.Reactors are,however, an immense problems at offing or at least trying to,safely that is, and we've seen the problems with respect to Chernobyl, and now Fukushima, and results of the problem with nuclear plants.........and..........at what costs now, what with food chain contamination, jobs,livelihoods, fishing etc etc etc, and..... of health.......immediate in some cases, long term on others(30-40 year cancer developments,sufferings,and symptomatic deaths), mutations of,genetic damage of, future generations(as in deformities,infirmaties,malformities).All at high cost indeed.So
where is this cheap,easy,safe, electricity? It isn't,it doesn't exist.Just build and start up and commission a nuclear plant, and the utility rises the cost of electricity. However I must admit,thermals are subject to the costs of oil it seems,oil fired, that is.So start up a thermal oil fired, and utilities raise the costs,due they say,due to cost of the fuel due to the greater consumption of same,and of electricity so generated but, recall the more one consumes according to the laws of capitalism, the laws of supply and demand,the costs of said fuel,are supposed to...drop,but this economic law does not function in reality.No, costs are raised with increasing demand, the reverse of capitalism, so what's at work there? Natural gas is not supposed to
increase with the costs of oil importation,world prices as it were.But me thinks to government is at work here.in detrimental fashion, working hand in glove with the oil monopoly and the natural gas companies as well, as natural gas is in no way shape nor form dependent on nor connected with oil, but when one rises,the other does as well, strangely, and out of sorts.
However, government could and should regulate this, but then government seems to be influenced by utilities and oil concerns in and after some here to fore not revealed publicly fashion. Never the less, in spite of all this, thermal generation is very much safer for the general public and vastly less expensive as well.Face it, a thermal plant will NEVER result in a Chernobyl, nor Fukushima, cities will NEVER have to be evacuated due to thermal plant malfunction, nor lands and seas hopelessly contaminated, nor human life cancerously irradiated.Face it, dollar for dollar, pound for pound, thermal plants have it all over
nuclear plants,utterly and completely, and in terms of the costs of human lives,livelihood and quality of life as well.Thermal is cheap,efficient, nuclear is the utter complete opposite,and is in no way shape nor form, in reality, in the truth of being on paper,on the financial balance sheet,financially justifiable.Thermal is the heaven, nuclear is the hell.Financially as well.
nuclear reactor, or you can build other types of generating facilities.Let's look at the costs now of nuclear, aside the radiation costs when a plant goes sour,the costs to farmers,fisherman, the costs to human life and lives,for a drastic period,the maiming,crippling,mutating effects of nuclear on the yet to be born,the cancers they generate when they go sour,the human and life factors, let's look at the heavy financial burdens they are besides the now evident extremely dangerous,unmanageable, extremely horrific bio hazard that they are.
Now construction costs, as of 2004, run to US$1,300 per kilowatt, or $650(to 780) million for a 500 MWe unit coal fired plant cost to build.Nuclear plants run at,usually, in the vicinity of,when producing electricity, twice that 1000mw area,around say 1300mw,output per reactor,average.So say costs of thermal plant then doubles to 1300,million, or 1.3Billion.Even if we then triple, it 1.9billion for 1500MW,versus the single reactor, the thermal equivalent is, really, inexpensive by comparison,as the Germans say, nicht whar? Thermal plants there for come out very,very much cheaper to build and operate versus the nuclear reactor.Say the units are a 4 reactor job,as Cherokee was, that equates to 7.6billion...all right.......but
Cherokee,nuclear, cost,and was abandoned at. an amazing 11billion building cost,and was still rising, when it was abandoned,but a thermal plant same capacity as Cherokee's 3 reactors, would cost,fixed,5.7 billion.Thermal is justifiably cheaper, by a very long shot.There's yet more to Cherokee, let's look at that.
The energy efficiency of a conventional thermal power station, considered as salable energy (in MW) produced at the plant busbars as a percent of the heating value of the fuel consumed, is typically 33% to 48% efficient,but politicians are refusing to allow utility companies to build coal fired power plants,favoring,strangely,expensively, and dangerously, nuclear plants.Public officials in Kansas, Oklahoma, and Texas have already denied several utilities permits to build coal fired plants that would generate cheap electricity for consumers.Keep in mind that wind energy is more expensive than coal fired electrical
plants.
Let's continue with yet another abandonment of nuclear construction, that of Marble Hill.When construction was finally closed,stopped,halted, more than $2.8 billion had been spent on construction, and it was only 20% complete,imagine, four 2 1000MW reactors.A thermal would cost 2.6 billion for same energy value of electricity the reactor(s) would produce, and yet be COMPLETED for that cost, and Marble Hill, at 2.8billion,was only 20% completed.So where is the cost energy saving there? So not true then is the statement that nuclear is cheaper,less costly, so very not at all.There's yet more to Marble Hill, let's look
at that much more closely...Marble Hill had two reactors, or was to , of about 1000mw each....Construction did proceed on Marble Hill, but at a somewhat slower pace with more regulatory emphasis on safety issues. Then a symbolic bombshell dropped on the project when, on May 8, 1979, Charles Cutshall, a former employee of Marble Hill's general contractor, Gust K. Newburg, filed an affidavit indicating that he and other Newburg employees had been told to "cover up" construction defects before inspectors could find them.When it finally closed,as in construction terminated, more than $2.8 billion had been spent on construction, and it was only 20% complete...and that, it seems, was defective.How many similar plants have defects in their so called containment structures?We can only guess, BUT we know it CAN and DOES, happen in practice.Specifically, the defects that Cutshall revealed were in the concrete poured in the walls of the containment buildings. Cutshall claimed that "honeycombs" were in a number of areas of the vital containment structure that would protect people from a breach of radioactive gas should a situation like Three Mile Island happen at Marble Hill.Not very enticing in construction is it?
Let's look at another costly non construction, or at least, completion.The Shearon Harris site was originally designed for four reactors, but budget issues and weak demand resulted in three of the reactors being cancelled. The final cost was nearly $3.9B,at abandonment.Yet more thermal plants could easily have been funded, and successfully built and in operation, at fractional costs for the sum total.
And how further expensive has been nuclear.Well, look at these abandonments of construction of reactors,at Bellefonte.Black Fox,Bodega Bay,Callaway,Cherokee,Clinton,Columbia,Hartsville,Haven,Hope Creek,Marble Hill,Midland,North Anna,Pebble Springs,Perry,Phipps Bend,River Bend,Pilrim,Satsop,Sears Island,Seabrook,Shearon Harris,Surrey,Tyrone,Yellow Creek,Zimmer,These abandonments in construction,have between them 45 reactors cancelled during construction due to costs, high costs,
enormous expenditures.So the reactors were thence far too costly for complete, and while 1 billion,at least per abandonment in construction, is low expenditure, some went to items such as $2.8 billion for only 20% complete.So nuclear is inexpensive,cheap,easy to construct? So very,very NOT!It SHOULD scream at you! It does! It should SCREAM at THEM,GOVERNMENT, but the scream falls on ears,deaf,dumb,blind, stupid,ignorant,retarded,and idiot, ears of the government, the politician.The 2.8 billion uselessly expended ,in this case,on Marble Hill,would've provided for 5 (five),count'em, 5(five) thermal plants of equal
electrical output,had the monies been expended on construction of them,and successful construction it WOULD most definitely have been as well.So in place of those 5, NONE,ZERO.Expensive? Yes,most assuredly, financially unsound decisions,undertakings, even yet in terms of cost alone.We all know the undertakings nuclear can and has resulted in, and is resulting in,undertakings not to be suffered by use of thermal,don't we.in terms of the cost LOST entirely on the abandonments, all of America could've been
provided with CHEAP electrical energy in sums vastly greater than existing nuclear plants all wasted, for nothing, on the nuclear dream,the nuclear lie, the nuclear hallucinogenic idiocy politicians suffer from.And many yet more as well in number than those present and existent nuclear plants.Is nuclear justified financially?In no way shape nor form.Cheap nuclear energy?
An unreality, a lie, the nuclear lie.
Now let's consider new constructions.......
Recent construction cost estimates
(http://en.wikipedia.org/wiki/Economics_of_new_nuclear_power_plants)
2007 estimates have considerable uncertainty in overnight cost, and vary widely from $2,950/kWe (overnight cost) to a Moody's Investors Service conservative estimate of between $5,000 and $6,000/kWe (final or "all-in" cost).
However, commodity prices shot up in 2008, and so all types of plants will be more expensive than previously calculated In June 2008 Moody's estimated that the cost of installing new nuclear capacity in the U.S. might possibly exceed $7,000/kWe in final cost.
The reported prices at six new pressurized water reactors are indicative of costs for that type of plant:
February 2008 — For two new AP1000 reactors at its Turkey Point site Florida Power & Light calculated overnight capital cost from $2444 to $3582 per kW, which were grossed up to include cooling towers, site works, land costs, transmission costs and risk management for total costs of $3108 to $4540 per kilowatt. Adding in finance charges increased the overall figures to $5780 to $8071 per kW.
March 2008 — For two new AP1000 reactors in Florida Progress Energy announced that if built within 18 months of each other, the cost for the first would be $5144 per kilowatt and the second $3376/kW - total $9.4 billion. Including land, plant components, cooling towers, financing costs, license application, regulatory fees, initial fuel for two units, owner's costs, insurance and taxes, escalation and contingencies the total would be about $14 billion.
May 2008 — For two new AP1000 reactors at the Virgil C. Summer Nuclear Generating Station in South Carolina South Carolina Electric and Gas Co. and Santee Cooper expected to pay $9.8 billion (which includes forecast inflation and owners' costs for site preparation, contingencies and project financing).
November 2008 — For two new AP1000 reactors at its Lee site Duke Energy Carolinas raised the cost estimate to $11 billion, excluding finance and inflation, but apparently including other owners costs.
November 2008 — For two new AP1000 reactors at its Bellefonte site TVA updated its estimates for overnight capital cost estimates ranged to $2516 to $4649/kW for a combined construction cost of $5.6 to 10.4 billion (total costs of $9.9 to $17.5 billion).
April 2008 — Georgia Power Company reached a contract agreement for two AP1000 reactors to be built at Vogtle, at an estimated final cost of $14 billion plus $3 billion for necessary transmission upgrades.
In comparison, the AP1000 units already under construction in China have been reported with substantially lower costs due to significantly lower labour rates:
In 2007, the reported cost for the first two AP1000 units under construction in China was $5.3 billion.
In 2009, the published cost for 4 AP1000 reactors under construction in China was a total of $8 billion.
Notice the immense costs, a very far cry from the by comparison peanut cost of a thermal plant of course, these are the projected costs, the actual construction costs......curiously.......escalate yet further.
Let's look at Vermont, and the Vermont Yankee nuclear plant.It is a General Electric boiling water reactor (BWR) type nuclear power plant currently owned by Entergy. It is located in the town of Vernon, Vermont, and generates 620 megawatts (MWe) of electricity at full power.Note that a thermal coal or other fired plant could do the same,produce just as much, cost considerably less, and be infinitely safer in operations.Now the plant began commercial operations in 1972. It provided 71.8% of all electricity generated in Vermont in 2008, which is 35% of the overall electricity used in the state.Again, note so too could a thermal plant you know.
Coal fired, and thermal, have a life expectancy of 25 years in design,same a nuclear really, but can also be easily renovated to go far longer,at far less cost, than a renovated job on a nuclear reactor plant,and at far less cost than nuclear plants.Also note that no less than 38 coal fired plants STILL exist in the United States,from the 1940's.A nuclear plant would so utterly and completely not be here in that time slot.The coal fired goes on and on and on and on....and safely too.
Generally speaking, nuclear plants were designed for a life of about 30 years. Newer plants are designed for a 40 to 60-year operating life.Thermal plants easily match and exceed this.But what happens at the end of life, the end of a reactor? It must be decommissioned,dismantled,taken away,bury etc etc etc, and so too must it's nuclear fuel needs be decommissioned as it were.How is this done? Well there is the so called..
Safe Enclosure (or Safestor(e) SAFSTOR):
This option postpones the final removal of controls for a longer period, usually in the order of 40 to 60 years.
And..
Entombment:
This option entails placing the facility into a condition that will allow the remaining on-site radioactive material to remain on-site without the requirement of ever removing it totally. This option usually involves reducing the size of the area where the radioactive material is located and then encasing the facility in a long-lived structure such as concrete, that will last for a period of time to ensure the remaining radioactivity is no longer of concern.
Yes,it can be dismantled and buried, and the spent and nuclear fuels specially stored in water pools for dozens of years etc. and only safely as long as it's storage pool water levels can be maintained, else the rods go in to self-criticality and release radiations just as they do and would if a reactor suffers coolant loss. And so now we know,too, that the building itself, et all support buildings,etc what they previously cost in sum toto, is a write off......in short.......the building(s) is(are) useless,in all instances......and build a new reactor.well look at the costs of building.....and the escalating costs......
Additional costs, hidden costs, of a reactor.......the required mining, processing of and then conversion to Fuel rods and from rods assembly to fuel bundles,in short creation of it's fuel,is expensive.Consider coal,oil,natural gas is much easily, and if not int he same fashion, got out of the ground, yes, but then nucelar fuel has enormous processing development,creation costs versus that which the thermal plant uses.Thermal plants use coal, oils, natural gas, easily gotten hold of, processed as you are familiar with.Thermals also don not have the after use storage of costs of the so called spent (only partially spent bundles,you know, as are most definately capable of self-criticality whence water is removed from them as we know, generating the self same nuclear radiations of all varieties just as if the reactor had exposed and melted down, especially since they are stored in QUANTITY,vast QUANTITY at the nuclear site or wherever they are stored, and thence after the cost of dismantling and burial storage of a dirty reactor),fuels.
Tired of the thermal plant?Switch it off.Decomission it, simply abandon it. It can be started up again later,anytime really at miniscule costs.On, off, no problem.Reactors are,however, an immense problems at offing or at least trying to,safely that is, and we've seen the problems with respect to Chernobyl, and now Fukushima, and results of the problem with nuclear plants.........and..........at what costs now, what with food chain contamination, jobs,livelihoods, fishing etc etc etc, and..... of health.......immediate in some cases, long term on others(30-40 year cancer developments,sufferings,and symptomatic deaths), mutations of,genetic damage of, future generations(as in deformities,infirmaties,malformities).All at high cost indeed.So
where is this cheap,easy,safe, electricity? It isn't,it doesn't exist.Just build and start up and commission a nuclear plant, and the utility rises the cost of electricity. However I must admit,thermals are subject to the costs of oil it seems,oil fired, that is.So start up a thermal oil fired, and utilities raise the costs,due they say,due to cost of the fuel due to the greater consumption of same,and of electricity so generated but, recall the more one consumes according to the laws of capitalism, the laws of supply and demand,the costs of said fuel,are supposed to...drop,but this economic law does not function in reality.No, costs are raised with increasing demand, the reverse of capitalism, so what's at work there? Natural gas is not supposed to
increase with the costs of oil importation,world prices as it were.But me thinks to government is at work here.in detrimental fashion, working hand in glove with the oil monopoly and the natural gas companies as well, as natural gas is in no way shape nor form dependent on nor connected with oil, but when one rises,the other does as well, strangely, and out of sorts.
However, government could and should regulate this, but then government seems to be influenced by utilities and oil concerns in and after some here to fore not revealed publicly fashion. Never the less, in spite of all this, thermal generation is very much safer for the general public and vastly less expensive as well.Face it, a thermal plant will NEVER result in a Chernobyl, nor Fukushima, cities will NEVER have to be evacuated due to thermal plant malfunction, nor lands and seas hopelessly contaminated, nor human life cancerously irradiated.Face it, dollar for dollar, pound for pound, thermal plants have it all over
nuclear plants,utterly and completely, and in terms of the costs of human lives,livelihood and quality of life as well.Thermal is cheap,efficient, nuclear is the utter complete opposite,and is in no way shape nor form, in reality, in the truth of being on paper,on the financial balance sheet,financially justifiable.Thermal is the heaven, nuclear is the hell.Financially as well.
Sunday, March 13, 2011
Secret Squirrel On Japan's Emerging Nuclear Emergency.
Secret Squirrel has noticed the massive problems in Japan caused by the earthquakes which have severely damaged several of Japan's nuclear plants.Is nuclear energy safe? Well, There is, or was, Chernobyl\Prypat,Three Mile Island, and others, and,yes, there is Japan. Should Japan have and keep nuclear plants,sitting as it is
on many shifting tectonic plates? Japan is in disaster, it is a natural disaster, it staggers from disaster to disaster,periodically,decades in between, due to the earthquakes.Japan is one of the most earthquake-prone countries in the world, perched on top of several converging tectonic plates.Geological instability causes around 1,000 tremors in the country each year, although many of these go undetected by the public.Every time they do strike they are a reminder that it is long overdue "a Big One",and now, they've had one,and will have yet more, as earthquakes are known to bring many happy returns.Japan falls in Seismic Zone V, the very high-risk zone for seismic activity and generated tsunamis they create(Japan's earthquakes occur at the coast and under the sea).
Now, with what has happened in Japan nobody can say that nuclear power is safe and clean. Look at Japan's "safely built" reactors at present.........not so safe it seems. Could they be built safer? No, not in light of what has occurred. Should the reactors be decommissioned, the damaged ones? Yes. Should the others also be decommissioned,?Yes. Indeed they supply 30% of Japan's energy needs, but that 30% must be filled in another manner.As it was,before 1968, that figure was at 0%,and there were no worries about each being a Chernobyl,no worries of radiation caused sickness,offspring deformed oddities etc due to radiation leakages from malfunctioning or exploding, or exploded,nuclear plants.Sadly, extremely unwisely, Japan placed it's energy requirement fulfillment on nuclear energy, most definitely, as now with most of it's nuclear plants shut down, it must go in to rolling black out mode, seemingly not being able to generate enough electrical energy to meet the demands
of Japan, needs which before the advent and now evident dependency on nuclear energy, were filled by other means, such as thermal.Did you know all a nuclear reactor does(besides emit massive quantities of radiation, and explode),is,quite simply, to heat,as in boil,water, converting it to steam, that in turning, turning a steam turbine which drives a generator, to generate electricity.It's a highly dangerous way of ridiculously simply boiling water. There are alternatives to the nuclear problem now revealed, improved thermal plants, geothermal plants(Japan sits on a vast resource of volcanic activity),improved pump storage electrical generation facilities,for example.But Japan unwisely started to go with a dependency on the unstable,unwise, nuclear alternative.
Presently Japanese efforts to prevent a nuclear meltdown by flooding reactors with seawater are a last-ditch attempt,to prevent meltdown, but authorities claim that does not mean that a nuclear tragedy is imminent even though cooling pumps and systems are failing and not working,radioactive vapours being vented,and containment facilities exploding and such, experts said Sunday.
At the Daiichi plant in Fukushima,at the Fukushima Daiichi Nuclear Power Plant, all of the three reactors -- Nos. 1,2 and 3 -- are at risk for meltdown because of the powerful earthquake and tsunami that struck on Friday.An explosion caused by hydrogen buildup Saturday blew the roof off a concrete building housing the plant's No. 1 reactor, but the reactor and its containment system were not damaged in the explosion. Officials said the No. 3 reactor would also likely withstand a similar blast, noting that workers had already released gas from the building to try to prevent an explosion,it didn't work,it did the same thing, and was then followed by number 2 as well.At the Tokai reactors, the number 2 reactor
suffered a stopped cooling pump.Meanwhile, a state of emergency has been declared at Onagawa plant, where Japanese authorities say radioactivity readings have gone over allowed levels.
Reactors are having saltwater and boron(Boric Acid),being pumped in in efforts to cool them,there have been partial meltdowns.US nuclear experts have warned that pumping seawater to cool a quake-hit Japanese nuclear reactor is an “act of desperation” that could foreshadow a Chernobyl-like disaster, referring to the 1986 accident in Ukraine."If they are (using seawater), it's because they have no other choice," said James Walsh, a research associate at the security studies program at MIT. "The last thing you want to do is pump seawater and boron into a reactor."
The salt and boron will corrode the reactor, he said."Essentially, they are saving the white flag and saying, 'This plant is done,' " Walsh said. "This is a last-ditch mechanism to try to prevent overheating and to prevent a partial or full meltdown."Physicist Ken Bergeron said if the core melted through the reactor vessel it could flow onto the floor of the containment building. If that happens, the structure would likely fail.“ The containment building at this plant is certainly stronger than that at Chernobyl but a lot less strong than at Three Mile Island, so time will tell,” he said.At a another plant, in Onogawa, excessive radiation levels also were recorded.
Fifty six plants exist in Japan, and approximately 15 to be built,supposedly built for disasters such as occurred, but obviously, so very not.It's also obvious that it is unwise for Japan to have nuclear reactors,period, as Japan is,was, and always has been,very heavily earthquake prone,and they will bring Japan very many, happy returns.Anyone still favour nuclear options?
on many shifting tectonic plates? Japan is in disaster, it is a natural disaster, it staggers from disaster to disaster,periodically,decades in between, due to the earthquakes.Japan is one of the most earthquake-prone countries in the world, perched on top of several converging tectonic plates.Geological instability causes around 1,000 tremors in the country each year, although many of these go undetected by the public.Every time they do strike they are a reminder that it is long overdue "a Big One",and now, they've had one,and will have yet more, as earthquakes are known to bring many happy returns.Japan falls in Seismic Zone V, the very high-risk zone for seismic activity and generated tsunamis they create(Japan's earthquakes occur at the coast and under the sea).
Now, with what has happened in Japan nobody can say that nuclear power is safe and clean. Look at Japan's "safely built" reactors at present.........not so safe it seems. Could they be built safer? No, not in light of what has occurred. Should the reactors be decommissioned, the damaged ones? Yes. Should the others also be decommissioned,?Yes. Indeed they supply 30% of Japan's energy needs, but that 30% must be filled in another manner.As it was,before 1968, that figure was at 0%,and there were no worries about each being a Chernobyl,no worries of radiation caused sickness,offspring deformed oddities etc due to radiation leakages from malfunctioning or exploding, or exploded,nuclear plants.Sadly, extremely unwisely, Japan placed it's energy requirement fulfillment on nuclear energy, most definitely, as now with most of it's nuclear plants shut down, it must go in to rolling black out mode, seemingly not being able to generate enough electrical energy to meet the demands
of Japan, needs which before the advent and now evident dependency on nuclear energy, were filled by other means, such as thermal.Did you know all a nuclear reactor does(besides emit massive quantities of radiation, and explode),is,quite simply, to heat,as in boil,water, converting it to steam, that in turning, turning a steam turbine which drives a generator, to generate electricity.It's a highly dangerous way of ridiculously simply boiling water. There are alternatives to the nuclear problem now revealed, improved thermal plants, geothermal plants(Japan sits on a vast resource of volcanic activity),improved pump storage electrical generation facilities,for example.But Japan unwisely started to go with a dependency on the unstable,unwise, nuclear alternative.
Presently Japanese efforts to prevent a nuclear meltdown by flooding reactors with seawater are a last-ditch attempt,to prevent meltdown, but authorities claim that does not mean that a nuclear tragedy is imminent even though cooling pumps and systems are failing and not working,radioactive vapours being vented,and containment facilities exploding and such, experts said Sunday.
At the Daiichi plant in Fukushima,at the Fukushima Daiichi Nuclear Power Plant, all of the three reactors -- Nos. 1,2 and 3 -- are at risk for meltdown because of the powerful earthquake and tsunami that struck on Friday.An explosion caused by hydrogen buildup Saturday blew the roof off a concrete building housing the plant's No. 1 reactor, but the reactor and its containment system were not damaged in the explosion. Officials said the No. 3 reactor would also likely withstand a similar blast, noting that workers had already released gas from the building to try to prevent an explosion,it didn't work,it did the same thing, and was then followed by number 2 as well.At the Tokai reactors, the number 2 reactor
suffered a stopped cooling pump.Meanwhile, a state of emergency has been declared at Onagawa plant, where Japanese authorities say radioactivity readings have gone over allowed levels.
Reactors are having saltwater and boron(Boric Acid),being pumped in in efforts to cool them,there have been partial meltdowns.US nuclear experts have warned that pumping seawater to cool a quake-hit Japanese nuclear reactor is an “act of desperation” that could foreshadow a Chernobyl-like disaster, referring to the 1986 accident in Ukraine."If they are (using seawater), it's because they have no other choice," said James Walsh, a research associate at the security studies program at MIT. "The last thing you want to do is pump seawater and boron into a reactor."
The salt and boron will corrode the reactor, he said."Essentially, they are saving the white flag and saying, 'This plant is done,' " Walsh said. "This is a last-ditch mechanism to try to prevent overheating and to prevent a partial or full meltdown."Physicist Ken Bergeron said if the core melted through the reactor vessel it could flow onto the floor of the containment building. If that happens, the structure would likely fail.“ The containment building at this plant is certainly stronger than that at Chernobyl but a lot less strong than at Three Mile Island, so time will tell,” he said.At a another plant, in Onogawa, excessive radiation levels also were recorded.
Fifty six plants exist in Japan, and approximately 15 to be built,supposedly built for disasters such as occurred, but obviously, so very not.It's also obvious that it is unwise for Japan to have nuclear reactors,period, as Japan is,was, and always has been,very heavily earthquake prone,and they will bring Japan very many, happy returns.Anyone still favour nuclear options?